Friday 8 August 2014

Kitchen & Bathroom cabinetry - tick!

Kitchen and bathroom cabinetry was delivered early this week and install is finishing up today! Also saw we have our water tank when I drove past today too :)

SS called today and said our tiles should be delivered early next week, the bags of cement have already been delivered. Tiler should be able to start next week, he has just been a few days behind as he has been doing display homes. SS will call us early next week once the tiles are delivered so we can make sure they are the right ones.

Hopefully our guy will come in to measure for our shutters next week so we can get them ordered ASAP, don't want to be living with sheets on the windows for too long! Now that our skirting is on in our carpeted rooms I have called Choices to get them to go out and do their final check measure.

SS also mentioned that the slab has been filled in where we had the brick over hanging at the back of the house which is great! He said they will fill in the drilled out concrete in Bedroom 2 next week (where that wayward random pipe was originally placed).

I'll get out there on the weekend to take some snaps, though they will probably be the type where it's through the window with reflection now that we are locked out ;)